I was able to continue to work on the welding table for my client, and made some good progress today! The leveling legs are done, and the top frame is nearly completed! Check out the pictures!
-
Drilling the holes for the threaded rods. -
Getting the threaded rods pounded into the base plates nice and straight! -
Checking squareness after welding. -
I welded a flange nut to the base plate to be able to use a wrench for leveling the welding table in the future. -
A closeup of the TIG welds! -
Drilling the hole for flange nuts into one of the corner pieces of the top frame. -
TIG welding the flange nuts in place. -
A closeup! -
MIG welding the corner pieces to the frame rails. -
A closeup of the weld bead. -
Another closeup! -
Clamping the frame to my welding table for welding. -
After adding the center rail to the top frame. -
Adding the leg plates to the top frame. -
A closeup of a corner! -
The top frame is upside down to finish weld the bottom of it. -
A closeup of one of the center leg plates. -
At the end of the day! -
A closeup of one of the leveling feet in place!