Yesterday I was able to pickup all the brackets and plates from JIT Powder Coating in Farmington, after they had finished them, and today was the day to get them all installed. Here are pictures of the two projects!
After getting back to the shop. I checked out the powder coated finish, and they turned out very nice!
Here is another view of a bracket.
After drilling holes into the cabinet front, the brackets were inserted and bolted on from the back.
The process went very well, and all the brackets and plates were installed in two hours.
Here is a picture of the 12′ bar top.
Here is a picture of the 7′ bar top with the cutout for the post.
A closeup of the cutout. A quarz top will be added within the next few weeks to complete the project.
A final picture of the whole area.
The other project was a small kitchen peninsula in a residential home.
Here is the connection to the wall.
A picture of the bolts coming through the cabinet front.