I’ve continued working on this project for the last two days, and it’s coming together nicely. My client stopped by today to take a closer look at the welding table base, and is excited to get it soon, A few more things to get done tomorrow, and it will be ready for pickup!
-
Yesterday I started to mount the legs to the top frame. The forklift was helpful to have! -
First time standing on its own legs! -
A little signature plate on the top frame. -
Lifting it onto the welding table. -
Fabricating the two base frames. -
Welding the caster plates in place. -
End of yesterdays work. -
A closeup of the top of the caster plate. -
Drilling 1″ holes into the center rail of the top frame with my mag-drill. -
After flipping the base over, drilling the bottom side of the center rail. -
Back on the table to weld the base frames in place. -
My new 2-way clamps in action! -
Some welding action shots by my client! -
Fun to see yourself working! -
Another one! -
Those 2-way clamps work perfect! -
A closeup of a weld bead. -
Taking it off the welding table to flip it over and weld the bottom side. -
Its’ heavy, but the forklift makes it easy! -
More welding shots by my client! -
-
-
Welding the insides! Being comfortable while welding makes the biggest difference! -
Mounting the casters. -
Done for today! -
Another detail!