Today was the day scheduled to pickup the wheel chair ramp after powder coating at JIT Powder Coating Company in Farmington. Loading, transport trough a courier truck, unloading at the jobsite, and the installation went very smooth! Another happy customer! Here are some picture to show the finished piece in place!
All the parts waiting and ready to go on pallets at JIT Powder Coating Comany.
Unloading at the jobsite. The general contractor, Ed Noonan, has the right equipment to do it!
The ramp is assembled and just needs to be bolted to the floor.
Another view! I really like how the finish turned out!
The transition from the ramp to the threshold of the door. It lined up beautifully!
A closeup of how the handrail is securely fastened to the wall right next to the door.
The finished ramp completely assembled and bolted to the garage floor.