Today I continued to work on the LED signs to get them ready for pickup in the evening! I completed the hand rubbed finish on the face plates, and installed the LED strip lighting. Here are some more images of this project.
Starting the process of installing the receiver and power unit with 3M double sided adhesive tape.
Stuck in the right spot to get the power cord in, and the wire for the receiving IR eye out.
Starting to go around the interior of the sign and sticking the LED strip light to the frame.
To increase the light output, I went around twice with the strip lights.
Here are some pictures showing the different colors.
Testing different color settings and sequences.
Took those images and send them to the client. He was thrilled!